Little Time Remains To Comment On Proposed I-11 Sonoran Corridor

Members of the public have until Friday, October 26, to share comments, suggestions and recommendations about proposed alternatives for the Sonoran Corridor, which would connect Interstate 10 and Interstate 19 south of Tucson International Airport.

The proposed Sonoran Corridor has been designated as a high-priority corridor under the federal Fixing America’s Surface Transportation (FAST) Act. There is no timeline for building a roadway in the corridor.

This is the second period for public comment about the Sonoran Corridor. There was a public meeting and comment period in June 2017.

Comments can be made via:

Email: [email protected]

Toll-free bilingual information line: 855.712.8530

Mail: Sonoran Corridor Tier 1 EIS Study Team, c/o Joanna Bradley, 1221 S. Second Ave., Mail Drop T100, Tucson, AZ 85713

Comments must be received by Friday, Oct. 26, to be included in the record.

About ADI Staff Reporter 13742 Articles
Under the leadership of Editor-in -Chief Huey Freeman, our team of staff reporters bring accurate,timely, and complete news coverage.